GEOSPLIT marked proppant is added to the ordinary proppant base mass, then is injected into the reservoir as a propping material during hydraulic fracturing.
Later, there is a long period (not less than two years) of gradual washing-out of the marker-reporters with water and oil. They are transported to the surface via reservoir fluid flow. Marker-reporters are segregated to both oil and water reservoir fluid phases
Coordination of the project scope of works and
sampling schedule with the Customer
Procurement of ceramic proppant,
incoming quality control
Synthesis of quantum marker-reporters
Production of marked proppant GEOSPLIT, output quality control, packaging and marking
Delivery of marked proppant GEOSPLIT to the Customer
Field quality control during multistage hydraulic fracturing operations